-40%
HOT Brand IR Preheating Oven Preheating Station FOR PCB SMD BGA T8280
$ 118.34
- Description
- Size Guide
Description
T-8280 Preheating OvenMain component function explanation
:
Operation instructions
:
1. Inspect the machine and then open it
①
Check the connection of the power line.
②
Turn on the power switch. Allow the T-8280 Power-On-Self-Test (POST) to complete. After this, Temperature set-points will display last value used.
③
The black switch on the front panel are used to control the infrared preheating plate; press the blue button “▲”(up)
,
the red button“▼”(down), can adjust the infrared preheating plate temperature between
0
℃
and
450
℃
. Press the button“ON”
,
the infrared preheating plate starts to work, press“OFF”
,
it stops working.
2. Operation of preheating PCB board
(1) The placement and adjustment of the PCB board
:
①
According to the size of the PCB board, adjust the PCB board holder, then put the PCB board and fix the adjust knob.
②
According to the size of PCB board and welding technological requirement, press the blue button “▲”(up)and the red button “▼” (down), regulate the output temperature of preheating plate between
0
℃
and
450
℃
(2) Preheating open and close:
①
Press the “ON” button
,
open the preheating plate about 3-5 minutes, make the temperature be the setting value then carry on the next step .
②
Finishing, press “OFF”, the preheating plate stops working.
Attention
:
Don’t close the power switch until the machine full cooling.
③
The preheating temperature set: If the PCB board contains lead, adjust the infrared preheating plate temperature to 100
-120
℃
; if not, adjust to 120
-140
℃
. You can also set the preheating temperature according to the user’s experience and technology.
3. Machine installation and adjustment:
The preheating plate heating type includes: the total pressure flow-through heating way and the PID percentage adjustment way. You can adjust it according to the preheating allowance. Generally speaking, if the preheating temperature is lower than
250
℃
, selects the PID percentage adjustment method; and if the preheating temperature is higher than
250
℃
, use the total pressure flow-through heating way.
Adjustment method
:
1. Press “▲”power-on, display: C=?
2. Press “▲”choose 0 or 1,every press the status change one time,
C=0 is PID percentage adjustment, C=1 is switching control.
3. Press “▼”OK
Cautions!
1. After finishing, don’t turn off the power immediately; make sure the infrared preheating plate complete cooling.
2. Keep the ventilation free-flowing, the infrared preheating plate clean, use dehydrated alcohol clean it regularly!
3. The high temperature operation, pay attention, avoid scalding.
4. If you don’t use the machine for a long time, you’d better pull off the power source plug!
Warranty
:
The whole machine maintains for one year and the spare parts maintains for three months. .Provides the immediate network online Q/A and the technical advisory work service.
Statement
:
If there is any difference between users operating manual and actual product, according to the actual product!
Shipping Policy
We will send out the item within 2-3 days through DHL/EMS/FEDEX /UPS/SPEEDPAK/CHINA POST to the below countries:
Belgium, Netherlands, Luxembourg, Italy, Germany, France, United Kingdom, San Marino;
Austria ,Denmark ,Finland ,Greece ,Ireland ,GUERNSEY ,JERSEY ,Norway ,
Portugal , spain , Sweden , Switzerland;
Bulgaria,Cyprus,Estonia,Latvia,Lithuania,Malta,slovakia,slovenia;
Czech Republic, Hungary, Poland, Romania,.
Australia ,New Zealand ,Korea South, Malaysia, Thailand, Philippines ,Singapore , Bruniei ,Taiwan , Macau, Indonesia,
USA, Canada
We will send tracking number to your eBay email within 1 day after sending out your item
We will mark the item at the very low value, so that you do not need to pay for the tax or pay a little tax.
Payment policy:
We accept Paypal only.
Payments must be finished within 5 working days after bid, otherwise, Unpaid Item dispute will be reported to eBay.
Refund &Return policy
We take all the responsibility during delivery. If you do not receive your item, we will refund you the full money or send you a new item according to your request.
We can accept the return item within 60 days after the buyer receives it. Once we receive the return item, then we will refund you full money.
Feedback Policy
We will very appreciate you give us positive feedback
ASAP. If the item you got in any problem, PLS don’t hesitates to contact us. We will do our best to help solve the problem